Projects
Electrical
Electrical Installation for Portstar Ltd
Full electrical installation delivered for new-build luxury apartments in Ascot, providing a complete, compliant and high-quality system in accordance with BS 7671 Wiring Regulations and project specifications. The works covered all aspects of power distribution across private apartments and landlord areas, ensuring reliability, safety and a premium finish throughout.
- Installation of incoming electrical supplies and main distribution equipment
- Sub-main cabling to serve individual apartments and communal areas
- Distribution boards installed within each apartment
- Integration of protective devices and surge protection where required
- Full system labelling, testing and certification
Electrical
LV Electrical & Containment Works – Facultatieve Technologies
LV electrical and containment installation carried out in support of an incinerator project within a Tier 1 public sector environment. The works ensured full compliance with current regulations, site standards and detailed project specifications, with a focus on durability, safety and long-term performance.
- Installation of heavy-duty cable tray, ladder rack, basket, trunking and conduit
- Containment systems installed across plant rooms, service routes and external areas
- Segregation and mechanical protection provided for all electrical services
- Accurate levelling, alignment and secure fixing of all containment
Electrical
Substation & HV Infrastructure Installation – ISS
Installation of a new substation and feeder pillar, delivered alongside temporary generator support to maintain continuity of supply throughout the works. The project included HV cable jointing and testing, ensuring full compliance with current regulations and site-specific requirements, with a strong focus on safety and operational resilience.
- Delivery, positioning and installation of substation equipment
- Installation of transformer, HV/LV switchgear and associated ancillaries
- Installation and full fit-out of feeder pillar with terminations and labelling
- Provision and management of temporary generator backup
- HV cable jointing, testing and commissioning
Electrical
ATS & Generator Infrastructure Upgrade – ISS
Critical infrastructure upgrade works undertaken to enhance the reliability and performance of Automatic Transfer Switch and generator systems within a science critical building. Temporary generation solutions were implemented to ensure uninterrupted power supply during all phases of the project.
- Inspection and assessment of existing ATS and generator systems
- Identification of required upgrades for capacity and compliance
- Modification or replacement of ATS equipment as required
- Upgrades to control systems, switching devices and associated components
- Supply and management of temporary generators to maintain continuity
mechanical
Boiler Plant Upgrade – ISS
Upgrade works carried out on existing boiler plant within a science critical environment, including burner replacement and temporary boiler provision to ensure continuous heating and hot water supply. The project was delivered with careful planning to minimise disruption and maintain system integrity.
- Isolation and safe shutdown of existing boiler systems
- Removal of existing burner assemblies from two boilers
- Installation of new burner assemblies with associated components and controls
- Integration with existing boiler plant and system connections
- Provision of temporary boiler systems to maintain continuous service
Mechanical
Chiller Plant Replacement & System Upgrade
Replacement of the existing chiller plant with a new unit, including all associated electrical and mechanical modifications to support installation and commissioning. Temporary cooling provision was implemented to maintain uninterrupted service, with careful coordination to minimise disruption to site operations and ensure system continuity throughout the works.
- Installation and commissioning of new chiller plant
- Provision and connection of temporary chiller to maintain cooling services
- Supply and installation of new buffer vessel with valves, fittings and connections
- Modification, extension and pressure testing of associated pipework
- Removal and safe disposal of redundant equipment and installation of new supports and containment
Ready to Discuss Your Next Project?
Whether you’re planning a new installation, upgrading existing systems, or delivering a larger project, Bourneside Services is ready to help.
Accreditations





